[Ann] 4.7 beta

Previous Topic Next Topic
 
classic Classic list List threaded Threaded
4 messages Options
Reply | Threaded
Open this post in threaded view
|

[Ann] 4.7 beta

Tudor Girba-2
Hi,

As a result of the successful Moose Dojo that took place on November 15-16, Moose 4.7 entered the beta state. Some of the outcomes of the Dojo are:
- Cleaned a couple of hundred obsolete FAMIX navigation methods (by Robert and Nicolas)
- Fixed the major bug when editing code (by Andrei and Stephan)
- Fixed several other Glamour bugs (by Erwann)
- Worked on improving the PPAllParsersBrowser (by Jan)
- Got the GTDebugger to start to work with Bifrost (by Jorge and Andrei)
- Got Reloader almost ready to work with Metacello and produce a reloadable version of the complete Moose (by Stephane and me).

The 6 remaining issues are listed on the issue tracker:
http://code.google.com/p/moose-technology/issues/list?q=milestone%3D4.7

Of these, the most important are:
- http://code.google.com/p/moose-technology/issues/detail?id=869 (an unfortunate side effect of getting the code editing fast)
- http://code.google.com/p/moose-technology/issues/detail?id=865 (we need to find the way to get the proper loading order of all packages)

Anyone want to join efforts on these?

Ideally, we should release somewhere at the beginning of December. Afterwards, we move to Pharo 2.0.

Cheers,
Doru


--
www.tudorgirba.com

"In a world where everything is moving ever faster,
one might have better chances to win by moving slower."




_______________________________________________
Moose-dev mailing list
[hidden email]
https://www.iam.unibe.ch/mailman/listinfo/moose-dev
Reply | Threaded
Open this post in threaded view
|

Re: [Ann] 4.7 beta

Usman Bhatti
Hello,

I can have a look at this one during the next week:

One click distribution has old vms

Usman

On Sun, Nov 25, 2012 at 12:47 AM, Tudor Girba <[hidden email]> wrote:
Hi,

As a result of the successful Moose Dojo that took place on November 15-16, Moose 4.7 entered the beta state. Some of the outcomes of the Dojo are:
- Cleaned a couple of hundred obsolete FAMIX navigation methods (by Robert and Nicolas)
- Fixed the major bug when editing code (by Andrei and Stephan)
- Fixed several other Glamour bugs (by Erwann)
- Worked on improving the PPAllParsersBrowser (by Jan)
- Got the GTDebugger to start to work with Bifrost (by Jorge and Andrei)
- Got Reloader almost ready to work with Metacello and produce a reloadable version of the complete Moose (by Stephane and me).

The 6 remaining issues are listed on the issue tracker:
http://code.google.com/p/moose-technology/issues/list?q=milestone%3D4.7

Of these, the most important are:
- http://code.google.com/p/moose-technology/issues/detail?id=869 (an unfortunate side effect of getting the code editing fast)
- http://code.google.com/p/moose-technology/issues/detail?id=865 (we need to find the way to get the proper loading order of all packages)

Anyone want to join efforts on these?

Ideally, we should release somewhere at the beginning of December. Afterwards, we move to Pharo 2.0.

Cheers,
Doru


--
www.tudorgirba.com

"In a world where everything is moving ever faster,
one might have better chances to win by moving slower."




_______________________________________________
Moose-dev mailing list
[hidden email]
https://www.iam.unibe.ch/mailman/listinfo/moose-dev


_______________________________________________
Moose-dev mailing list
[hidden email]
https://www.iam.unibe.ch/mailman/listinfo/moose-dev
Reply | Threaded
Open this post in threaded view
|

Re: [Pharo-project] [Ann] 4.7 beta

Stéphane Ducasse
In reply to this post by Tudor Girba-2

On Nov 25, 2012, at 12:47 AM, Tudor Girba wrote:

> Hi,
>
> As a result of the successful Moose Dojo that took place on November 15-16, Moose 4.7 entered the beta state. Some of the outcomes of the Dojo are:
> - Cleaned a couple of hundred obsolete FAMIX navigation methods (by Robert and Nicolas)
> - Fixed the major bug when editing code (by Andrei and Stephan)
> - Fixed several other Glamour bugs (by Erwann)
> - Worked on improving the PPAllParsersBrowser (by Jan)
> - Got the GTDebugger to start to work with Bifrost (by Jorge and Andrei)

I will extract the GDTDebugger model to push it into Pharo2.0.

> - Got Reloader almost ready to work with Metacello and produce a reloadable version of the complete Moose (by Stephane and me).

I will send more information to dale and I hope to get some time to work on it this week.

Stef

>
> The 6 remaining issues are listed on the issue tracker:
> http://code.google.com/p/moose-technology/issues/list?q=milestone%3D4.7
>
> Of these, the most important are:
> - http://code.google.com/p/moose-technology/issues/detail?id=869 (an unfortunate side effect of getting the code editing fast)
> - http://code.google.com/p/moose-technology/issues/detail?id=865 (we need to find the way to get the proper loading order of all packages)
>
> Anyone want to join efforts on these?
>
> Ideally, we should release somewhere at the beginning of December. Afterwards, we move to Pharo 2.0.
>
> Cheers,
> Doru
>
>
> --
> www.tudorgirba.com
>
> "In a world where everything is moving ever faster,
> one might have better chances to win by moving slower."
>
>
>
>


_______________________________________________
Moose-dev mailing list
[hidden email]
https://www.iam.unibe.ch/mailman/listinfo/moose-dev
Reply | Threaded
Open this post in threaded view
|

Re: [Ann] 4.7 beta

abergel
In reply to this post by Tudor Girba-2
Nice to see such a progress

Alexandre


On Nov 24, 2012, at 8:47 PM, Tudor Girba <[hidden email]> wrote:

> Hi,
>
> As a result of the successful Moose Dojo that took place on November 15-16, Moose 4.7 entered the beta state. Some of the outcomes of the Dojo are:
> - Cleaned a couple of hundred obsolete FAMIX navigation methods (by Robert and Nicolas)
> - Fixed the major bug when editing code (by Andrei and Stephan)
> - Fixed several other Glamour bugs (by Erwann)
> - Worked on improving the PPAllParsersBrowser (by Jan)
> - Got the GTDebugger to start to work with Bifrost (by Jorge and Andrei)
> - Got Reloader almost ready to work with Metacello and produce a reloadable version of the complete Moose (by Stephane and me).
>
> The 6 remaining issues are listed on the issue tracker:
> http://code.google.com/p/moose-technology/issues/list?q=milestone%3D4.7
>
> Of these, the most important are:
> - http://code.google.com/p/moose-technology/issues/detail?id=869 (an unfortunate side effect of getting the code editing fast)
> - http://code.google.com/p/moose-technology/issues/detail?id=865 (we need to find the way to get the proper loading order of all packages)
>
> Anyone want to join efforts on these?
>
> Ideally, we should release somewhere at the beginning of December. Afterwards, we move to Pharo 2.0.
>
> Cheers,
> Doru
>
>
> --
> www.tudorgirba.com
>
> "In a world where everything is moving ever faster,
> one might have better chances to win by moving slower."
>
>
>
>
> _______________________________________________
> Moose-dev mailing list
> [hidden email]
> https://www.iam.unibe.ch/mailman/listinfo/moose-dev

--
_,.;:~^~:;._,.;:~^~:;._,.;:~^~:;._,.;:~^~:;._,.;:
Alexandre Bergel  http://www.bergel.eu
^~:;._,.;:~^~:;._,.;:~^~:;._,.;:~^~:;._,.;:~^~:;.



_______________________________________________
Moose-dev mailing list
[hidden email]
https://www.iam.unibe.ch/mailman/listinfo/moose-dev