|
If I install the new D6 download, but want to preserve the work I already
have in STS - I assume that I attach to the same repository.
However when I first did this with the old beta, it asked me if I wanted to
baseline the OA code in the image.
How can I get it to redo this process when I attach an updated image to STS?
Is there some script I can run?
I want to do this as sometime I play around with base methods and like to
revert back to them - however this is dangerous if I don't have updated
methods as I would then revert to older beta methods?
Tim
|