[Pharo 8.0] Build #546: 4055-Code-Completion-temp-vars-have-methods-with-colons-as-suggestions

Previous Topic Next Topic
 
classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

[Pharo 8.0] Build #546: 4055-Code-Completion-temp-vars-have-methods-with-colons-as-suggestions

ci-pharo-ci-jenkins2
There is a new Pharo build available!
 
The status of the build #546 was: SUCCESS.

The Pull Request #4056 was integrated: "4055-Code-Completion-temp-vars-have-methods-with-colons-as-suggestions"
Pull request url: https://github.com/pharo-project/pharo/pull/4056

Issue Url: https://github.com/pharo-project/pharo/issues/4055
Build Url: https://ci.inria.fr/pharo-ci-jenkins2/job/Test%20pending%20pull%20request%20and%20branch%20Pipeline/job/Pharo8.0/546/