how can I move an issue from resolved to work needed?

Previous Topic Next Topic
 
classic Classic list List threaded Threaded
4 messages Options
Reply | Threaded
Open this post in threaded view
|

how can I move an issue from resolved to work needed?

Stéphane Ducasse
for example


10071
Reply | Threaded
Open this post in threaded view
|

Re: how can I move an issue from resolved to work needed?

Marcus Denker-4
There is a "Reactivate" button on the lower left.

At first his is a bit strange, the difference between Active, Resolved and Closed, but it seems
to not bad atter using things for a while.

Marcus


On Mar 26, 2013, at 2:12 PM, Stéphane Ducasse <[hidden email]> wrote:

for example


10071

Reply | Threaded
Open this post in threaded view
|

Re: how can I move an issue from resolved to work needed?

camille teruel
In reply to this post by Stéphane Ducasse
Click on reactivate on the bottom left 

On 26 mars 2013, at 14:12, Stéphane Ducasse wrote:

for example


10071

Reply | Threaded
Open this post in threaded view
|

Re: how can I move an issue from resolved to work needed?

camille teruel
In reply to this post by Marcus Denker-4
Marcus, it seems that both of us have problems with right/left :D

On 26 mars 2013, at 14:16, Marcus Denker wrote:

There is a "Reactivate" button on the lower left.

At first his is a bit strange, the difference between Active, Resolved and Closed, but it seems
to not bad atter using things for a while.

Marcus


On Mar 26, 2013, at 2:12 PM, Stéphane Ducasse <[hidden email]> wrote:

for example


10071