preparing for moose 5.0

Previous Topic Next Topic
 
classic Classic list List threaded Threaded
7 messages Options
Reply | Threaded
Open this post in threaded view
|

preparing for moose 5.0

Tudor Girba-2
Hi,

We will have a Moose 5.0 release soon (ideally this month). What is left to do is:
- Integrate PP-Islands (Jan? :))
- Migrate relevant visualizations from Roassal1 to Roassal2
- Drop Roassal1 and GraphET1 from the configuration (the packages will still be loadable, only not supported anymore)

Are there other topics we should be aware of?

Cheers,
Doru

--

"Every thing has its own flow"

_______________________________________________
Moose-dev mailing list
[hidden email]
https://www.iam.unibe.ch/mailman/listinfo/moose-dev
Reply | Threaded
Open this post in threaded view
|

Re: preparing for moose 5.0

Tudor Girba-2
Hi,

I forgot to mention that it would be fantastic if we can find the energy to continue the refactoring of the configuration into Units and Assemblies. If not, we can postpone it until after the release when we move to Pharo 4.

Cheers,
Doru




On Thu, Sep 4, 2014 at 7:31 AM, Tudor Girba <[hidden email]> wrote:
Hi,

We will have a Moose 5.0 release soon (ideally this month). What is left to do is:
- Integrate PP-Islands (Jan? :))
- Migrate relevant visualizations from Roassal1 to Roassal2
- Drop Roassal1 and GraphET1 from the configuration (the packages will still be loadable, only not supported anymore)

Are there other topics we should be aware of?

Cheers,
Doru

--

"Every thing has its own flow"



--

"Every thing has its own flow"

_______________________________________________
Moose-dev mailing list
[hidden email]
https://www.iam.unibe.ch/mailman/listinfo/moose-dev
Reply | Threaded
Open this post in threaded view
|

Re: preparing for moose 5.0

Jan Kurš
I will have a look at the PP-Islands thingy...


On 4 September 2014 07:37, Tudor Girba <[hidden email]> wrote:
Hi,

I forgot to mention that it would be fantastic if we can find the energy to continue the refactoring of the configuration into Units and Assemblies. If not, we can postpone it until after the release when we move to Pharo 4.

Cheers,
Doru




On Thu, Sep 4, 2014 at 7:31 AM, Tudor Girba <[hidden email]> wrote:
Hi,

We will have a Moose 5.0 release soon (ideally this month). What is left to do is:
- Integrate PP-Islands (Jan? :))
- Migrate relevant visualizations from Roassal1 to Roassal2
- Drop Roassal1 and GraphET1 from the configuration (the packages will still be loadable, only not supported anymore)

Are there other topics we should be aware of?

Cheers,
Doru

--

"Every thing has its own flow"



--

"Every thing has its own flow"

_______________________________________________
Moose-dev mailing list
[hidden email]
https://www.iam.unibe.ch/mailman/listinfo/moose-dev



_______________________________________________
Moose-dev mailing list
[hidden email]
https://www.iam.unibe.ch/mailman/listinfo/moose-dev
Reply | Threaded
Open this post in threaded view
|

Re: preparing for moose 5.0

Tudor Girba-2
Thanks!

Doru


On Thu, Sep 4, 2014 at 8:50 AM, Jan Kurš <[hidden email]> wrote:
I will have a look at the PP-Islands thingy...


On 4 September 2014 07:37, Tudor Girba <[hidden email]> wrote:
Hi,

I forgot to mention that it would be fantastic if we can find the energy to continue the refactoring of the configuration into Units and Assemblies. If not, we can postpone it until after the release when we move to Pharo 4.

Cheers,
Doru




On Thu, Sep 4, 2014 at 7:31 AM, Tudor Girba <[hidden email]> wrote:
Hi,

We will have a Moose 5.0 release soon (ideally this month). What is left to do is:
- Integrate PP-Islands (Jan? :))
- Migrate relevant visualizations from Roassal1 to Roassal2
- Drop Roassal1 and GraphET1 from the configuration (the packages will still be loadable, only not supported anymore)

Are there other topics we should be aware of?

Cheers,
Doru

--

"Every thing has its own flow"



--

"Every thing has its own flow"

_______________________________________________
Moose-dev mailing list
[hidden email]
https://www.iam.unibe.ch/mailman/listinfo/moose-dev



_______________________________________________
Moose-dev mailing list
[hidden email]
https://www.iam.unibe.ch/mailman/listinfo/moose-dev




--

"Every thing has its own flow"

_______________________________________________
Moose-dev mailing list
[hidden email]
https://www.iam.unibe.ch/mailman/listinfo/moose-dev
Reply | Threaded
Open this post in threaded view
|

Re: preparing for moose 5.0

abergel
In reply to this post by Tudor Girba-2
> - Migrate relevant visualizations from Roassal1 to Roassal2
> - Drop Roassal1 and GraphET1 from the configuration (the packages will still be loadable, only not supported anymore)

We are working on these

Alexandre


_______________________________________________
Moose-dev mailing list
[hidden email]
https://www.iam.unibe.ch/mailman/listinfo/moose-dev
Reply | Threaded
Open this post in threaded view
|

Re: preparing for moose 5.0

Usman Bhatti
In reply to this post by Tudor Girba-2
Hi, 

Pease keep the 5.0 job on jenkins for some time so that downstream projects can move at their own pace and convenience.

tx.

usman


On Thu, Sep 4, 2014 at 7:31 AM, Tudor Girba <[hidden email]> wrote:
Hi,

We will have a Moose 5.0 release soon (ideally this month). What is left to do is:
- Integrate PP-Islands (Jan? :))
- Migrate relevant visualizations from Roassal1 to Roassal2
- Drop Roassal1 and GraphET1 from the configuration (the packages will still be loadable, only not supported anymore)

Are there other topics we should be aware of?

Cheers,
Doru

--

"Every thing has its own flow"

_______________________________________________
Moose-dev mailing list
[hidden email]
https://www.iam.unibe.ch/mailman/listinfo/moose-dev



_______________________________________________
Moose-dev mailing list
[hidden email]
https://www.iam.unibe.ch/mailman/listinfo/moose-dev
Reply | Threaded
Open this post in threaded view
|

Re: preparing for moose 5.0

stepharo
In reply to this post by Tudor Girba-2

On 4/9/14 07:37, Tudor Girba wrote:
Hi,

I forgot to mention that it would be fantastic if we can find the energy to continue the refactoring of the configuration into Units and Assemblies. If not, we can postpone it until after the release when we move to Pharo 4.
I'm not allowed to do pharo for a couple of months so after that period this is definitively something that I would like to do.


Cheers,
Doru




On Thu, Sep 4, 2014 at 7:31 AM, Tudor Girba <[hidden email]> wrote:
Hi,

We will have a Moose 5.0 release soon (ideally this month). What is left to do is:
- Integrate PP-Islands (Jan? :))
- Migrate relevant visualizations from Roassal1 to Roassal2
- Drop Roassal1 and GraphET1 from the configuration (the packages will still be loadable, only not supported anymore)

Are there other topics we should be aware of?

Cheers,
Doru

--

"Every thing has its own flow"



--

"Every thing has its own flow"


_______________________________________________
Moose-dev mailing list
[hidden email]
https://www.iam.unibe.ch/mailman/listinfo/moose-dev


_______________________________________________
Moose-dev mailing list
[hidden email]
https://www.iam.unibe.ch/mailman/listinfo/moose-dev